Sunday, January 06, 2008

Bathroom Renovation #2 - More Concrete!

Next, we had to tear out the wall tile that surrounded the entire bathroom. Sounds easy enough, right? Of course not. This tile was attached to 1" thick concrete that was attached to a wire mesh. Once again Branden's hammer drill saved the day. After another day beneath face masks and at least 50 more crate loads of concrete, we finally had most of the nasty stuff out for good. Now I'm just wondering if we should have rented that roll-away dumpster Melissa wanted.

1 comments:

Sandy said...

There's still time to order that dumpster....